lardon3d/prompt/31_IMPLEMENTATION_ORDER.md

2.5 KiB

31 — Implementation Order

Status

IMPLEMENTATION_ORDER=DEPENDENCY_DRIVEN
IMPLEMENTATION_AUTHORIZATION=NO
STEP_0_USER_FACING_LANGUAGE_NORMALIZATION=PASS
CURRENT_NEXT=CALIBRATION_SCIENCE_V2_DESIGN

Authority

docs/product/product_definition.md, current roadmap and dependencies confirmed on current main.

PLANNED ORDER

Implementation remains unauthorized until the human explicitly authorizes a tranche.

Default dependency order:

  1. user-facing repository/UI language normalization where appropriate — PASS;
  2. final usable Calibration Science/Tooling/Bootstrap/Workflow v1 compatibility path — PASS/FROZEN;
  3. Calibration Science v2 design for heterogeneous cameras/lenses/focals, adaptive capture settings and autofocus — CURRENT;
  4. Calibration v2 heterogeneous-optics persistence / Tooling / Bootstrap / workflow foundation;
  5. physical autofocus/optical applicability validation and dedicated calibrated real campaign;
  6. real Sparse SfM proof;
  7. durable Dense/OpenMVS orchestration;
  8. mesh / refinement / texturing / export;
  9. viewer foundation;
  10. offline Coverage Analysis scientific contract and implementation;
  11. multi-campaign registration / fusion;
  12. generic live acquisition adapter foundation;
  13. A6000 HDMI integration;
  14. S21 integration;
  15. live camera localization;
  16. live coverage overlay;
  17. actionable Capture Guidance;
  18. video ingestion / deterministic keyframes;
  19. final integration, UX, restart and performance proof;
  20. Product Definition v1 Definition-of-Done closure.

Adjustment rule

Change this order only when current repository inspection proves a real dependency difference. Preserve product intent and document the dependency.

Step 0 closure does not authorize mechanical rewriting of historical persisted labels, path names, deliberate UTF-8 fixtures or persistence-sensitive internal strings. Such text is changed only when its owning scope requires it.

Do not jump to A6000 live work merely because it is visually interesting. Reconstruction/viewer/coverage foundations required for truthful guidance come first.

The calibration-v2 insertion before the physical campaign is dependency-driven, not feature creep: real acquisition evidence established that the v1 locked-focus single-optical-state path would make normal engine-bay capture impractical and would contradict the already-FROZEN product requirement for multiple optical configurations per project. Science v2 must be defined before collecting the physical evidence intended to validate it.