147 lines
2.6 KiB
Markdown
147 lines
2.6 KiB
Markdown
# Roadmap
|
|
|
|
## Gate 0 — Project contract
|
|
|
|
Status: PASS
|
|
|
|
Canonical result:
|
|
|
|
```text
|
|
GATE_0=PASS
|
|
GATE_0_REVIEW_01=PASS
|
|
```
|
|
|
|
Gate 0 established:
|
|
|
|
- repository structure;
|
|
- development contract;
|
|
- architecture documentation;
|
|
- coding-style rules;
|
|
- exchange-format draft;
|
|
- structural and semantic validation;
|
|
- positive and negative fixture strategy.
|
|
|
|
Reviewed hardening commit:
|
|
|
|
```text
|
|
bc54d6b4ce10d098916823b6a79f72b39d9c7703
|
|
```
|
|
|
|
Gate 0 closure commit:
|
|
|
|
```text
|
|
ebd4316ed68c58598a471e567edf13455d00f92b
|
|
```
|
|
|
|
## Gate 1 — Exchange format v1 freeze
|
|
|
|
Status: VALIDATION PENDING — REVIEW #1
|
|
|
|
Canonical state:
|
|
|
|
```text
|
|
GATE_1_REVIEW_01=IMPLEMENTED
|
|
GATE_1=VALIDATION_PENDING
|
|
TRAINLOG_FORMAT_V1=DRAFT
|
|
```
|
|
|
|
Review #1 freezes the proposed model for:
|
|
|
|
- exercise identity;
|
|
- stable repetition/duration tracking mode;
|
|
- session identity;
|
|
- session ordering;
|
|
- external/none/assistance load semantics;
|
|
- planned versus actual sets;
|
|
- zero-repetition failed attempts;
|
|
- planned exercises with zero actual sets;
|
|
- planned rest;
|
|
- body weight;
|
|
- final v1 body-measurement field list;
|
|
- optional notes;
|
|
- strict catalog completeness;
|
|
- strict unknown-field behavior.
|
|
|
|
Exit criteria:
|
|
|
|
- all valid fixtures accepted;
|
|
- all invalid fixtures rejected for the intended reason;
|
|
- Android documentation aligned;
|
|
- TUI documentation aligned;
|
|
- schema and semantic validator aligned;
|
|
- review commit pushed to Forgejo and GitHub;
|
|
- mirrored review passes;
|
|
- `TRAINLOG_FORMAT_V1=FROZEN`.
|
|
|
|
## Gate 2 — TUI persistence core
|
|
|
|
Deliverables:
|
|
|
|
- Meson C17 project;
|
|
- SQLite open/create;
|
|
- schema versioning;
|
|
- exercise catalog;
|
|
- session import transaction;
|
|
- idempotent import tests.
|
|
|
|
Exit criteria:
|
|
|
|
- database tests pass;
|
|
- sanitizer validation passes.
|
|
|
|
## Gate 3 — Minimal TUI
|
|
|
|
Deliverables:
|
|
|
|
- ncursesw initialization;
|
|
- centralized color theme module;
|
|
- dashboard shell;
|
|
- exercise list;
|
|
- session history;
|
|
- direct session entry;
|
|
- import screen;
|
|
- minimum-terminal fallback.
|
|
|
|
Exit criteria:
|
|
|
|
- usable color TUI;
|
|
- monochrome fallback;
|
|
- UTF-8 test pass.
|
|
|
|
## Gate 4 — Android recorder
|
|
|
|
Deliverables:
|
|
|
|
- local exercise catalog;
|
|
- start/stop session timestamps;
|
|
- target entry;
|
|
- actual-set entry;
|
|
- rest entry;
|
|
- body data;
|
|
- JSON export.
|
|
|
|
Exit criteria:
|
|
|
|
- exported fixture validates against frozen v1;
|
|
- exported file imports successfully into the TUI.
|
|
|
|
## Gate 5 — Analytics
|
|
|
|
Deliverables:
|
|
|
|
- body-weight trend;
|
|
- measurement trend;
|
|
- exercise performance trend;
|
|
- training volume summaries;
|
|
- terminal graphs.
|
|
|
|
## Gate 6 — Hardening
|
|
|
|
Deliverables:
|
|
|
|
- broader fixture coverage;
|
|
- migrations;
|
|
- import/export robustness;
|
|
- documentation cleanup;
|
|
- packaging;
|
|
- first tagged release.
|